FinWise Bank

Challenge: Single Person, Maximum Effectiveness

Results:
  • One person, < 3 months
  • merged 2 systems,
  • built a full EDW
  • Gap Analysis Provided to Business
  • Business Vault Generated via Automation Solution
  • Business Vault and Information Layer Tailored to Business Needs
Generated:
  • 90% of the ETL code
  • 100% of the Load and Staging Model
What Did FinWise Achieve?

Scalability, no re-engineering, decreased development time, data auditability, agility, quality, disparate data source integration, and speed of delivery.

Customer Quote:

If you’re not using the DV2.0 to build out your EDW you’re seriously missing business value.

Christopher Ziebert
Data Architect, FinWise Bank

Similar Posts

  • Lockheed Martin

    Challenge:Massive Integrations… Results: 250+ source systems Integrated to 1 Data Vault EDW Servicing over 5000 business users daily with sub-second query response times Over two thousand unique reports Crossing 10 lines of business Tracking Rocket Builds from Start to Launch (circa 1997, still active today) Lockheed Martin began their journey with Data Vault in 1990. …

  • Pepper Money Australia

    Challenge: Minimized Re-Engineering and Full Auditability Results: “Data Vault 2.0 delivers full auditability by protecting the integrity and origin of the data.” “For us, the Data Vault 2.0 has provided significant benefits. We were able to change our data warehouse whilst minimizing the re-engineering costs.  Now we have a system that is more closely aligned…

  • JP Morgan Chase

    Challenge:Rapid Merger and Acuqisition Results: Merged 3 companies in 90 days  (Circa 2001) ALL systems, ALL DATA! 125 people, multiple cultures Business Value produced during Due Diligence phase. JP Morgan Chase used the Data Vault model, methodology and architecture to perform due diligence, and ultimately to merge 3 companies in 90 days.  I met with…