Challenge:
Team Size Scalability / Elasticity…

Scaling Team Sizes:  (Circa 2009)

  • Grew team to 60 people for two weeks
  • Shrunk team to 20 critical staff for business delivery (6 weeks)
  • Included Entry Level When Needed

They had a need to increase the team size by leveraging local college students.  These were interns to the IT staff and their job was to move the data from the source systems to the target landing zone.  Part of their job was also to profile the data, understand and document the metadata, and provide definitions to the data warehousing team.

Later, the management also decided that a few interns were needed on the BI delivery side, so they expaed the team when requirements swelled – in order to get custom reports out quickly.  Once the reports were developed they were able to release the college students, and return to a skeleton BI staff.

They essentially replaced 60+ outsourced full time consultants with college interns and automation tooling, saving cost, improving quality, and reducing errors in work products.  This had the side benefit of giving college interns actual work experience. Become more lean and mean with Data Vault 2.0 today. Not sure if Data Vault 2.0 is for your business? Learn more about Data Vault 2.0  here

Similar Posts

  • Pepper Money Australia

    Challenge: Minimized Re-Engineering and Full Auditability Results: “Data Vault 2.0 delivers full auditability by protecting the integrity and origin of the data.” “For us, the Data Vault 2.0 has provided significant benefits. We were able to change our data warehouse whilst minimizing the re-engineering costs.  Now we have a system that is more closely aligned…

  • Cendant Timeshare Resource Group

    Challenge: Closing Operational Gaps Results: Cendant Timeshare Resource Group implemented Operational Data Vault, eliminating all other sources and rewriting their application. Increased their profitability by 2.5x in 24 months. (Circa 2003) Managed 100,000 properties world wide. Cendant had 5 disparate operational systems, and 2 disparate legacy data warehouses.  They wanted to consolidate all of them,…

  • FinWise Bank

    Challenge: Single Person, Maximum Effectiveness Results: One person, < 3 months merged 2 systems, built a full EDW Gap Analysis Provided to Business Business Vault Generated via Automation Solution Business Vault and Information Layer Tailored to Business Needs Generated: 90% of the ETL code 100% of the Load and Staging Model What Did FinWise Achieve?…

  • Department of Defense

    Challenge: Scalability with No Re-Engineering Produced Data Vault, Scaled to 3 Petabytes (circa 2003) still growing today Sub-second query responses Zero re-engineering to add more data, and expand This project was done to serve the needs of the public.  They captured real-time streams that focused on image processing and image recognition.  The premise is: capture…

  • Raytheon

    Challenge: Unstructured Image Processing in Real Time Results: Ingesting 100,000 images per second across 10 parallel streams, creating business value by capturing Satellite Images of weather, hashing them for correlation analysis. (Circa 2001, still in use today) Turning unstructured data into information in real-time! Raytheon had a number of challenges.  Their job was to ingest…